Heat demand and temperatures
We discuss the building, previous fuel use, emitters and required flow temperatures. A heat load calculation and design check determine equipment size; old boiler capacity alone is insufficient.
Merano · South Tyrol · Heat pumps & heating
A heat pump needs a suitable building, heat distribution system and electrical supply. Martin and Patrick assess these together, for a renovation or a new energy system.
Discuss your project
Projects
Heating at 2,200 metres: this photo comes from a mountain refuge and shows pipework, an expansion vessel, pressure gauge and circulation pump. It documents the hydraulic side of our work. Equipment, routing and service access need to be considered together even where space is limited.
Projects →We discuss the building, previous fuel use, emitters and required flow temperatures. A heat load calculation and design check determine equipment size; old boiler capacity alone is insufficient.
Distribution, flow rate, balancing and hot water needs shape the design. Patrick covers these connections; tanks and controls are selected for the actual system.
Martin checks connection capacity, protection, metering and electrical integration. Solar can supply part of a heat pump’s electricity. Winter heat demand rises while solar production falls; full solar supply cannot be promised in general.
Compatible equipment and interfaces can use surplus solar for hot water or heating. Comfort, temperature limits and safe operation take priority. An enable signal alone does not replace a coordinated control strategy.
The quotation sets out work by Voltalps, Patrick and any partners. Existing systems, permits and responsibilities are assessed for each project.
Solar generation and heat demand occur at different times. We assess self-consumption, storage and heat separately before coordinating them. The solar calculator does not replace a heat load calculation or heat pump design.
Calculate solar potential →Background: AI visualisation of energy flows
We clarify eligibility and technical requirements before the project starts.
Incentives →For suitable projects we also assess mining heat recovery. Electricity use, useful heat and financial risks are checked separately. This is not a substitute for sound heating design.
Mining heat recovery →Your town and project goal are enough to start. You can attach a roof photo directly.