More self-consumption
Cooling, machines, offices and charging run during the day, so much of the solar power is used directly.
Businesses · Merano · Burgraviato · South Tyrol
Businesses use power during the day, exactly when the sun shines. We design solar, storage and load management for trades, retail, hospitality and farms and show which incentive pays more: 180% super-depreciation or the provincial grant.
180% Super-depreciation for investments until 30.09.2028
New self-supply plants are depreciated for tax purposes at 280% of cost. Small businesses can use the 20% or 25% provincial grant instead, but not both on the same costs.
Cooling, machines, offices and charging run during the day, so much of the solar power is used directly.
Storage and load management smooth peaks, protect the grid connection and enable charging points for staff and customers.
We measure consumption over several days so the system fits, including the 105% limit of super-depreciation.
Design, installation, grid registration and technical documents for GSE or the province.
| Super-depreciation (state) | Provincial grant | |
|---|---|---|
| Who | All businesses based in Italy | Small businesses |
| Benefit | 180% uplift up to €2.5 million, then 100% and 50% | 20% of eligible costs, 25% without components from China |
| Period | Investments 01.01.2026 to 30.09.2028 | Application 1 January to 31 May before work starts (2026 closed) |
| Limits | At most 105% of the previous year’s demand, ENEA category B or C modules | Up to 100 kWp per business, storage up to 1 kWh per kWp |
| Procedure | GSE: reservation, confirmation after 20% deposit, completion with appraisal by 15.11.2028 | Online application via myCIVIS to the Office for Energy and Climate Protection |
The two routes cannot be combined on the same costs. Check the tax effect with your adviser; we provide the technical documents. Information as of 10.11.2026.

40 kWp on a complex tiled roof. A business with high daytime demand uses solar power where it is produced.
View project →Grid analysis and load profile over several days.
Super-depreciation or provincial grant, with your tax adviser.
Components matching the incentive, GSE reservation or application before work starts.
Installation, commissioning, appraisal and completion notice.
FAQ
Yes. Storage is eligible as part of the self-supply plant. Solar modules must be ENEA category B or C.
For super-depreciation only European modules of ENEA categories B or C. For the 25% provincial grant, modules, cells, inverters and batteries must not come from China. We choose components to match the route.
For super-depreciation at most 105% of the previous year’s demand; for the provincial grant up to 100 kWp per small business.
For super-depreciation by 30.09.2028, with the completion notice to the GSE by 15.11.2028.
The 2026 window ran from 1 January to 31 May. The 2027 guidelines are not yet published; we will inform you as soon as they are.
Send us your annual consumption and a roof photo. We will calculate both incentive routes.