Merano · South Tyrol · Electrical & energy systems

Businesses · Merano · Burgraviato · South Tyrol

Solar for businesses in Merano and South Tyrol

Businesses use power during the day, exactly when the sun shines. We design solar, storage and load management for trades, retail, hospitality and farms and show which incentive pays more: 180% super-depreciation or the provincial grant.

180% Super-depreciation for investments until 30.09.2028

New self-supply plants are depreciated for tax purposes at 280% of cost. Small businesses can use the 20% or 25% provincial grant instead, but not both on the same costs.

Why solar suits businesses

More self-consumption

Cooling, machines, offices and charging run during the day, so much of the solar power is used directly.

Lower peaks

Storage and load management smooth peaks, protect the grid connection and enable charging points for staff and customers.

Grid analysis first

We measure consumption over several days so the system fits, including the 105% limit of super-depreciation.

One partner

Design, installation, grid registration and technical documents for GSE or the province.

Two incentive routes compared

Super-depreciation (state)Provincial grant
WhoAll businesses based in ItalySmall businesses
Benefit180% uplift up to €2.5 million, then 100% and 50%20% of eligible costs, 25% without components from China
PeriodInvestments 01.01.2026 to 30.09.2028Application 1 January to 31 May before work starts (2026 closed)
LimitsAt most 105% of the previous year’s demand, ENEA category B or C modulesUp to 100 kWp per business, storage up to 1 kWh per kWp
ProcedureGSE: reservation, confirmation after 20% deposit, completion with appraisal by 15.11.2028Online application via myCIVIS to the Office for Energy and Climate Protection

The two routes cannot be combined on the same costs. Check the tax effect with your adviser; we provide the technical documents. Information as of 10.11.2026.

Several PV module fields on a red tiled roof between chimneys

Project: Zöggeler butcher’s, Burgstall

40 kWp on a complex tiled roof. A business with high daytime demand uses solar power where it is produced.

View project →

How we work

01

Measure demand

Grid analysis and load profile over several days.

02

Choose the incentive

Super-depreciation or provincial grant, with your tax adviser.

03

Design and reserve

Components matching the incentive, GSE reservation or application before work starts.

04

Build and document

Installation, commissioning, appraisal and completion notice.

FAQ

Questions from businesses

Does super-depreciation cover batteries?

Yes. Storage is eligible as part of the self-supply plant. Solar modules must be ENEA category B or C.

Which modules qualify?

For super-depreciation only European modules of ENEA categories B or C. For the 25% provincial grant, modules, cells, inverters and batteries must not come from China. We choose components to match the route.

How large may the system be?

For super-depreciation at most 105% of the previous year’s demand; for the provincial grant up to 100 kWp per small business.

By when must it be completed?

For super-depreciation by 30.09.2028, with the completion notice to the GSE by 15.11.2028.

When will the provincial grant reopen?

The 2026 window ran from 1 January to 31 May. The 2027 guidelines are not yet published; we will inform you as soon as they are.

Does solar pay off for your business?

Send us your annual consumption and a roof photo. We will calculate both incentive routes.